The pool interior, its edge and the surrounding deck need separate scope decisions. This photograph is not a priced project.
The short answer
Useful numbers need a named scope.
There is no single price here for a Los Angeles pool remodel. The references below are contractors' published ranges for different work, not a WAO quote or a survey of the local market. They give you starting points to discuss, not amounts to add together.
Replastering with new waterline tile
$20,000 to $22,000
USD · Los Angeles
The published bundle does not itemize every site cost. Confirm preparation, repairs, startup and disposal in a property-specific proposal.
Before collecting finish samples, decide which parts of the pool you hope to keep. That separates a surface conversation from a redesign conversation.
01 / Keep the layout
Renew the surface
You like the shape and how the pool works. Ask what preparation and repairs are needed before a new finish, whether tile is part of the work, and what happens during startup. A surface request is not a diagnosis of the shell.
02 / Rework the edge
Connect pool and patio
You want new coping, tile or adjoining paving. Mark where each material starts and stops. Ask how the pool edge meets the deck, what will be removed, and who makes good the adjacent areas.
03 / Change how it works
Redesign the pool
A new spa, different steps or a changed layout deserves its own investigation. Ask which design, engineering, equipment and utility decisions must be settled before the construction price can be reliable.
You might want new tile and hope to keep the coping. Write both down. Choose a starting preference for each part, then take the questions to your contractor.
No signup is needed. Choices stay in this open page and reset when you reload it. Copy or print them before leaving. They are not sent with a Find a Pro request.
12
Two neighboring parts, two separate lines in your request.
1 / Waterline tile
The green tile on the pool wall.
2 / Coping
The pale stone cap above the tile.
This view identifies parts, not damage or a measured work area. The wider deck and equipment need their own discussion.
Our team will discuss your project and whether we can help arrange a contractor conversation. Your notes are not transferred to that form.
We Are One / Pool planning
My pool-remodel conversation
Homeowner preferences, not an inspection, specification or price estimate. Keep unanswered items visible.
Interior finish: Not decided yet
What preparation, repairs and startup would the proposed finish work include?
Contractor's answer:
Waterline tile: Not decided yet
Which tile areas and removal work are included?
Contractor's answer:
Coping: Not decided yet
Which edge sections would change, and how would adjoining surfaces be handled?
Contractor's answer:
Surrounding deck: Not decided yet
Where does the work stop? Please mark the proposed area and identify removal and restoration.
Contractor's answer:
Equipment: Not decided yet
Which existing items can stay, and what needs assessment before the equipment scope can be priced?
Contractor's answer:
Check the connections
Please distinguish my preferences from what inspection establishes. List unresolved items rather than treating them as included or free.
We Are One / Pool planning
Before comparing prices
Keep confirmed work, allowances and unanswered items separate.
What stays: Pool shape, depth, steps, spa, equipment and paving you want to retain. Ask which items still need inspection.
Notes:
What changes: Finish, waterline tile, coping, lights and any changes to the shell. Name products and work areas where known.
Notes:
Work before the finish: Removal and preparation method, known repairs, and how newly discovered conditions will be documented and priced.
Notes:
Beyond the pool: Access route, protection, debris removal, utility work, paving repairs and planting restoration. Give each a boundary and a responsible party.
Notes:
Before swimming again: Who handles filling, startup and water care, what handover includes, and which written care instructions you receive.
Notes:
Still unpriced: Keep allowances, exclusions and unanswered items separate. Ask what must be checked before each can become a fixed scope.
A finish price tells you little about the path through the garden, the paving beside the coping or the equipment you plan to keep. Give those questions a place in the budget before choosing optional upgrades.
Use three headings: confirmed work, allowances and unpriced work. An unanswered item belongs in the third group, not at zero. Keep any reserve separate from the quoted work; a generic percentage cannot diagnose what this pool needs.
What will be removed, what has been inspected, and what process applies if a repair is discovered after work begins?
Equipment and services
Which existing items stay, which change, and who confirms the implications for plumbing, electricity and gas?
Access and restoration
How will materials and debris move through the property? Which paving, gates and planted areas are protected or restored?
Approvals and handover
Who confirms the requirements with the authority responsible for your address, pays the applicable fees, and handles startup and care instructions?
Turn a wish into a useful request
Not just “refresh the pool.”
Suppose you want a new finish and coping but hope to keep the deck and equipment. A more useful starting request is:
Keep the pool layout. Price the interior finish, waterline tile and coping separately from any deck replacement. Identify the preparation, repairs and startup included. Confirm which equipment can stay, and list anything that needs inspection before it can be priced.
That is not a finished specification. It makes your priorities visible while leaving the contractor room to explain what the property actually needs. If work affects the deck, ask for a marked boundary rather than accepting “affected paving” as the quantity.
Keep this beside your proposals
Your pool-remodel budget checklist.
Copy these six headings into your notes, or use the scope planner above to print your checklist. No signup is needed. Under each, record what is confirmed, what is allowed for and what is still unanswered.
What stays
Pool shape, depth, steps, spa, equipment and paving you want to retain. Ask which items still need inspection.
What changes
Finish, waterline tile, coping, lights and any changes to the shell. Name products and work areas where known.
Work before the finish
Removal and preparation method, known repairs, and how newly discovered conditions will be documented and priced.
Beyond the pool
Access route, protection, debris removal, utility work, paving repairs and planting restoration. Give each a boundary and a responsible party.
Before swimming again
Who handles filling, startup and water care, what handover includes, and which written care instructions you receive.
Still unpriced
Keep allowances, exclusions and unanswered items separate. Ask what must be checked before each can become a fixed scope.
Tell us what you want to keep. And what you want to change.
You do not need a finished design or a firm budget to start. Share your project and location. Our team will discuss your priorities and confirm whether we can help arrange a contractor conversation. This is not an instant quote or a promise of availability.
Checked October 21, 2026. We read the linked providers' current pages rather than relying on search snippets. Each number stays attached to its publisher and described work. We have not verified invoices or inspected the underlying projects, and the providers do not give matching pool dimensions. There is not enough comparable evidence here to calculate a local average or a cost per square foot.
Moda's page is dated May 7, 2026. J Designs' page was updated June 10, 2026. These are commercial sources, not independent surveys or endorsements. Published ranges can change; confirm the scope and current price directly in your proposals. We will review these references by January 21, 2027, or sooner if a source changes.
For California contract questions, use the CSLB homeowner checklists. Requirements depend on your work and jurisdiction; this guide does not determine permits or certify a contractor.